Świnoujście LNG Terminal (Poland)
more...Main characteristics of the project:
Construction of a gazoport including a large LNG Receiving Terminal of 5 BCMA capacity, 2 LNG Tanks of 160 000 m3 capacity together with a breakwater of 3 Km long and all port facilities including jetty and unloading platformBaltic Pipe (Denmark and Poland)
more...Main characteristics of the project:
Construction of a subsea gas pipeline of 300 Km long connecting the Danish transmission system with the Polish transmission system.LionGas LNG Terminal (Rotterdam)
more...Main characteristics of the project:
LNG Receiving terminal of LionGas located in Rotterdam (The Netherlands)Hazira LNG Terminal (India)
more...Main characteristics of the project:
FEED and project execution for an LNG receiving terminal in Hazira including 2 LNG tanks of 160 000 m3 capacity and complete new port facilities built on a reclaimed area.